What Is an 860 EDI Document? Buyer PO Changes for Growers
In live-goods horticulture, a forecast of weekend rain or a sudden spring warmup can prompt a retail buyer to adjust store quantities or shift delivery dates days after the original 850 Purchase Order was issued. The ANSI X12 860 Purchase Order Change Request (Buyer Initiated) (GS*PC) is the transaction that transmits those mid-cycle amendments into your ERP.
Quick Scorecard: EDI 860 at a Glance
A mid-cycle amendment transmitted by the retail buyer that modifies quantities, adds or cancels plant varieties, or shifts delivery dates on an already-issued 850 Purchase Order.
Partners include Tractor Supply, True Value, and Costco whenever weather swings or weekend promotions change store demand.
If a frost hits mid-week and the buyer sends an 860 cutting tender annual quantities, missing that 860 means you ship racks that get refused at the store or short-paid on the 810 invoice.
Some retailers send the 860 as a full order replacement while others send delta-only POC segments, and changes that arrive after pick tickets print must be caught before racks load.
Side-by-Side: Plain-English Operations vs. ANSI X12 Technical Spec
When Friday’s weather forecast changes on Tuesday, the buyer sends an 860.
Spring garden center demand moves with the weather. A sunny 72-degree forecast triggers add-on orders; an unexpected freeze prompts retail buyers to push ship dates back or cut tender annuals from the truck. Rather than cancelling the entire 850 Purchase Order and issuing a new PO number, the retailer sends an 860 Purchase Order Change Request.
For your shipping office, the critical question is where the order stands in fulfillment when the 860 arrives. Checking whether racks are still unpulled or already staged on the dock keeps pick sheets, GS1-128 rack labels, the 856 ASN, and the 810 Invoice aligned inside Work Suite FULFILL™.
- Operational Trigger: Mid-week buyer revisions to quantities, ship dates, or store allocations before dispatch.
- POC Action Codes: Distinguishes between adding a crop line (
AI), changing quantity (QD/QI/CA), or deleting a line (DI). - Replacement vs. Delta: Parsers must respect each partner’s rule on whether omitted PO1 lines remain active or are replaced.
- Dock Coordination: Any 860 arriving after pick tickets print requires dock verification before sealing the trailer.
X12 860 (GS*PC) BCH header semantics and POC line-change qualifiers.
An inbound 860 opens with the BCH segment (Beginning Segment for Purchase Order Change). BCH01 defines the transaction purpose (‘04’ Change or ‘01’ Cancellation), BCH02 specifies the order type (such as ‘NE’ New Order or ‘RL’ Release), BCH03 holds the original PO number from the 850, BCH06 holds the original PO date, and BCH11 holds the PO change date.
Line-level modifications are carried in POC (Line Item Change) loops rather than PO1 loops. POC02 specifies the change code: ‘QD’ (Quantity Decrease), ‘QI’ (Quantity Increase), ‘AI’ (Add Additional Item), ‘DI’ (Delete Item), or ‘CA’ (Changes to Line Item). POC03 states the new order quantity, while POC04 states the quantity left to receive.
- Functional Group: GS01 = ‘PC’ (Purchase Order Change Request), X12 versions 004010, 004060, and 005010.
- BCH Header: BCH01=‘04’ (Change) | ‘01’ (Cancel), BCH03=Original PO #, BCH06=PO Date, BCH11=Change Date.
- POC Change Codes: POC02=‘QD’ (Qty Decrease), ‘QI’ (Qty Increase), ‘AI’ (Add Item), ‘DI’ (Delete Item), ‘CA’ (Line Change).
- Audit Trail: Preserves original 850 PO1 quantities alongside 860 POC revisions for fill-rate reporting.
Verified De-Identified X12 860 Specimen
Below is a complete, de-identified ANSI X12 860 specimen modeled on wholesale nursery traffic. All purchase order numbers (08096470), store numbers (#1242), and UPCs (043210987655, 043210987716, 043210991102) are synthetic reference values:
ST*860*000088312~
BCH*04*NE*08096470***20260414*****20260415~
DTM*002*20260418~
N1*ST*GARDEN CENTER #1242*92*1242~
POC*10*QD*32*32*EA*5.25**VP*1G-HYD-END*SK*1000448219*UP*043210987655~
POC*20*DI*0*0*EA*6.50**VP*1G-LAV-HID*SK*1000448302*UP*043210987716~
POC*30*AI*24*24*EA*12.50**VP*10HB-GER-RED*SK*1000519004*UP*043210991102~
PID*F****10 IN HANGING BASKET GERANIUM RED~
CTT*3*56~
SE*10*000088312~
Segment-by-Segment Dual-Lens Breakdown
| Segment | In Plain English (Grower Meaning) | In Technical Terms (X12 Elements & Validation) |
|---|---|---|
ST*860 | ST*860: Buyer-Initiated Purchase Order Change Opens an official modification to an existing Purchase Order. | ST*860*000088312~ST01=‘860’, ST02=‘000088312’ inside functional group GS*PC. |
BCH | BCH*04*NE: Line-Item Modification to PO #08096470 Directs your ERP to look up PO #08096470 (dated April 14) and apply the line-item changes issued on April 15. | BCH*04*NE*08096470***20260414*****20260415~BCH01=‘04’ (Change), BCH02=‘NE’, BCH03=‘08096470’ (Original PO Number), BCH06=‘20260414’ (Original PO Date), BCH11=‘20260415’ (Change Date). |
DTM*002 | DTM*002: Updated Store Arrival Window Shifts the requested store delivery date back one day to April 18, 2026 due to cold weather. | DTM*002*20260418~DTM01=‘002’ (Delivery Requested), DTM02=‘20260418’. |
N1*ST | N1*ST: Target Store Location (#1242) Confirms this change applies to Store #1242. | N1*ST*GARDEN CENTER #1242*92*1242~N101=‘ST’, N103=‘92’, N104=‘1242’. |
POC*QD (Line 10) | POC*10*QD: Decrease Line 10 From 48 to 32 Pots Reduces Line 10 (1-Gallon Endless Summer Hydrangea) from 48 pots down to 32 pots. | POC*10*QD*32*32*EA*5.25**VP*1G-HYD-END*SK*1000448219*UP*043210987655~POC01=‘10’, POC02=‘QD’ (Quantity Decrease), POC03=‘32’ (New Order Qty), POC04=‘32’ (Qty Left to Receive), POC05=‘EA’, POC06=‘5.25’. |
POC*DI (Line 20) | POC*20*DI: Delete Line 20 (Lavender) Cancels the 36-pot Hidcote Lavender line ( 0 remaining). | POC*20*DI*0*0*EA*6.50**VP*1G-LAV-HID*SK*1000448302*UP*043210987716~POC01=‘20’, POC02=‘DI’ (Delete Item), POC03=‘0’, POC04=‘0’. |
POC*AI & PID*F (Line 30) | POC*30*AI: Add 24 Red Geranium Hanging Baskets Adds a new Line 30 for 24 10-inch Red Geranium Hanging Baskets at $12.50 each ($300.00). | POC*30*AI*24*24*EA*12.50**VP*10HB-GER-RED*SK*1000519004*UP*043210991102~ + PID*FPOC01=‘30’, POC02=‘AI’ (Add Additional Item), POC03=‘24’, POC04=‘24’, POC05=‘EA’, POC06=‘12.50’. |
CTT & SE | CTT & SE: 3 POC Lines & 56 Revised Units ($468.00) Counts all 3 POC segments (QD + DI + AI) and hashes the 56 surviving units (32 + 0 + 24). | CTT*3*56~ + SE*10*000088312~CTT01=‘3’ (POC segment count), CTT02=‘56’ (sum of POC03 quantities). |
Why Ignoring an 860 Breaks Both the Dock and the Invoice
When an inbound 860 arrives from Tractor Supply, True Value, Costco, or another retail partner, it supersedes the quantities, lines, or dates on the original 850 Purchase Order (BCH03):
- If You Ship the Old
850Quantity: Suppose Line 10 ordered48Hydrangea pots on the850, and the buyer’s860reduced Line 10 to32pots (POC*10*QD*32). If your pull team builds racks from an outdated Monday pick sheet and ships all48, the retailer refuses to pay for the 16 over-shipped pots on your810Invoice. - If You Miss an Added Promotional Line (
POC*AI): When a buyer adds24Red Geranium Hanging Baskets viaPOC*30*AI*24, missing the860causes an unshipped line short and hurts your vendor fill-rate scorecard.
Handling 860 Changes Before and After Racks Stage
The key operational check with an 860 is where the physical racks are on the dock when the change arrives:
- Order Not Yet Pulled: Updating the open order in Work Suite FULFILL applies the
POCquantity changes (QD,QI,DI,AI) andDTMdate revisions before pick tickets and rack labels print (and before any optional EDI 753 routing request is submitted). - Racks Already Staged on the Dock: When an
860arrives after racks are already tagged and staged, the shipping team must verify whether the staged rack can still be adjusted or whether an EDI 855 Purchase Order Acknowledgment (or buyer exception call) is required before the856ASN transmits.
Related Guides in the Grower EDI Library
- Flagship Interactive Reference: The Ultimate EDI Guide for Growers (All 18 X12 Sets & 12 VMI Data Files)
- Order & Change Cycle: EDI 850 Purchase Order · EDI 855 PO Acknowledgment · EDI 860 PO Change
- Dock, Routing & Rack ASN: EDI 753 & 754 Routing Instructions · EDI 856 Advance Ship Notice & Rack Manifest · EDI 204 Load Tender & 816 Store Directory
- Invoicing, Pay-by-Scan & Settlement: EDI 810 Invoice · EDI 812 Credit/Debit Adjustment · EDI 820 Payment Order & Remittance Advice
- Inventory, POS & Grocery UCS/DEX: EDI 846 Inventory Inquiry/Advice · EDI 852 Product Activity Data (POS) · Grocery UCS 875, 876 & 880 · DSD DEX 894 & 895 · 997, 824 & 864 Control Gates
Silver Fern's EDI team manages live retail EDI for growers today. Open the guide, see how Work Suite fits, or book a demo.