What Is an EDI 855 Purchase Order Acknowledgement?
When a retail buyer sends an 850 Purchase Order for live plants, weather swings or grading changes in the greenhouse can shift what is ready to ship. The ANSI X12 855 Purchase Order Acknowledgment (GS*PR) is your formal electronic reply confirming line-by-line quantities, ship dates, and authorized crop substitutions before the truck rolls.
Quick Scorecard: EDI 855 at a Glance
The grower’s line-by-line digital response to an inbound 850 Purchase Order (or a Reverse PO in VMI replenishment), confirming which crops will ship as ordered, which require a quantity or ship-date adjustment, and which are rejected or substituted.
Partners include Lowe’s, Tractor Supply, Walmart, H-E-B, Ace, Do It Best, and Albertsons.
Living crops do not always finish on the exact day a buyer forecast months ago. Communicating a crop short or date shift on the 855 within the SLA window avoids unannounced dock shorts and OTIF penalties.
Shorting a tray or swapping a plant variety on the physical rack without transmitting ACK*IQ or ACK*IC causes retail store receiving and the 810 invoice match to fail.
Side-by-Side: Plain-English Operations vs. ANSI X12 Technical Spec
Your window to confirm quantities, propose VMI Reverse POs, or shift ship dates before shipping.
Because nursery inventory is alive and weather-dependent, a heat wave or a late frost can shift crop readiness by a week. When an 850 Purchase Order arrives in your ERP, your availability team checks actual greenhouse inventory on hand before promising the truck. The 855 Purchase Order Acknowledgment tells the retailer’s buying system what you will put on the racks.
Instead of emailing a buyer and hoping their system updates before the truck arrives, the 855 updates the order at the line level: accepting a line in full, accepting with a reduced quantity, proposing a revised ship date, or flagging an authorized variety substitution. In Vendor-Managed Inventory (VMI) programs, growers can also send an outbound 855 as a ‘Reverse PO’ proposing replenishment quantities so the retailer’s system generates the official 850 PO number.
- SLA Window: Commonly required within 24 to 48 hours of receiving the inbound 850 Purchase Order.
- Header Disposition: Declares whether the PO is accepted in full (AD), accepted with changes (AC), or rejected (RD).
- Line-Level Precision: Every PO1 line includes its own ACK status code (Accepted, Changed Qty, Date Rescheduled, or Rejected).
- Reverse PO Orders: In VMI programs, an outbound 855 (
BAK01='16') proposes replenishment orders before the 850 is issued.
X12 855 (GS*PR) BAK header disposition and line-level PO1/ACK status qualifiers.
An outbound 855 begins with the BAK segment (Beginning Segment for Purchase Order Acknowledgment). BAK01=‘00’ indicates an original acknowledgment (or ‘16’ Proposed / Reverse PO in VMI replenishment), while BAK02 sets the document-level status: ‘AD’ (Acknowledge With Detail, No Change), ‘AC’ (Acknowledge With Detail and Change, commonly used whenever any ACK01 is not ‘IA’), or ‘RD’ (Reject with Detail). BAK03 echoes the buyer PO number from BEG03, and BAK04 holds the original PO date.
Within each PO1 line loop, the ACK (Line Item Acknowledgment) segment controls line-level reconciliation. ACK01 holds the two-character disposition code: ‘IA’ (Item Accepted), ‘IC’ (Item Accepted: Changes Made), ‘IQ’ (Item Accepted: Quantity Changed), ‘DR’ (Item Accepted: Date Rescheduled), or ‘IR’ (Item Rejected). When ACK01 is ‘IQ’ or ‘IC’, ACK02/ACK03 transmit the confirmed quantity and UOM, while CTT02 hashes the PO102 ordered quantities across all PO1 loops.
- Functional Group: GS01 = ‘PR’ (Purchase Order Acknowledgment), X12 versions 004010 and 005010.
- BAK Header: BAK01=‘00’ (Original) | ‘16’ (Reverse PO), BAK02=‘AD’ (No Change) | ‘AC’ (With Change) | ‘RD’ (Reject).
- Line ACK Codes: ACK*IA (Accepted), ACK*IQ (Qty Changed), ACK*DR (Date Rescheduled), ACK*IC (Sub/Change), ACK*IR (Rejected).
- ERP Integration: Generated from the committed order allocation in Work Suite FULFILL™.
Verified De-Identified X12 855 Specimen
Below is a complete, de-identified ANSI X12 855 specimen modeled on wholesale nursery traffic. All purchase order numbers (08096470), store numbers (#1242), and UPCs (043210987655, 043210987716) are synthetic reference values:
ST*855*000104821~
BAK*00*AC*08096470*20260414*****20260414~
DTM*068*20260415~
N1*ST*GARDEN CENTER #1242*92*1242~
PO1*10*48*EA*5.25**VP*1G-HYD-END*SK*1000448219*UP*043210987655~
ACK*IA*48*EA*068*20260415~
PO1*20*36*EA*6.50**VP*1G-LAV-HID*SK*1000448302*UP*043210987716~
ACK*IQ*24*EA*068*20260415~
CTT*2*84~
SE*10*000104821~
Segment-by-Segment Dual-Lens Breakdown
| Segment | In Plain English (Grower Meaning) | In Technical Terms (X12 Elements & Validation) |
|---|---|---|
ST*855 | ST*855: Purchase Order Acknowledgment Envelope Opens the PO Acknowledgment response back to the retail buyer. | ST*855*000104821~ST01=‘855’, ST02=‘000104821’ inside functional group GS*PR. |
BAK | BAK*00*AC: Acknowledge With Detail & Change Signals right at the header: ‘We accept PO #08096470, with at least one line-level quantity or date update.‘ | BAK*00*AC*08096470*20260414*****20260414~BAK01=‘00’ (Original), BAK02=‘AC’ (Acknowledge With Detail and Change; commonly AC when any ACK01 is not IA), BAK03=‘08096470’, BAK04=‘20260414’ (PO Date), BAK09=‘20260414’ (Ack Date). |
DTM*068 | DTM*068: Confirmed Greenhouse Ship Date Confirms the scheduled ship date (April 15, 2026) when rolling racks leave the nursery dock. | DTM*068*20260415~DTM01=‘068’ (Current Schedule Ship), DTM02=‘20260415’. |
N1*ST | N1*ST: Confirmed Ship-To Store Location (#1242) Echoes the destination store (Garden Center #1242) so multi-store PO batches remain tied to the right store. | N1*ST*GARDEN CENTER #1242*92*1242~N101=‘ST’, N103=‘92’, N104=‘1242’. Matches the inbound 850 N1*ST store identifier. |
PO1 & ACK*IA (Line 10) | Line 10 Confirmed as Ordered (48 Pots) Line 10 (1-Gallon Endless Summer Hydrangea) is ready to ship all 48 pots at $5.25 on April 15. | PO1*10*48*EA*5.25**VP*1G-HYD-END*SK*1000448219*UP*043210987655~ + ACK*IA*48*EA*068*20260415~ACK01=‘IA’ (Item Accepted), ACK02=‘48’, ACK03=‘EA’, ACK04=‘068’, ACK05=‘20260415’. |
PO1 & ACK*IQ (Line 20) | Line 20 Accepted With Crop Short (24 of 36 Pots) Only 24 of the 36 ordered Hidcote Lavender pots passed grading; ACK*IQ*24 commits to 24 so the store expects 24 before the truck ships. | PO1*20*36*EA*6.50**VP*1G-LAV-HID*SK*1000448302*UP*043210987716~ + ACK*IQ*24*EA*068*20260415~ACK01=‘IQ’ (Item Accepted: Quantity Changed) updates the expected receipt from 36 to 24 (72 confirmed units total across the 2 lines). |
CTT & SE | CTT & SE: Line Count (2 Lines) & PO1 Hash Total (84) Summarizes the 2 PO1 loops and hashes the PO102 quantities (48 + 36 = 84). | CTT*2*84~ + SE*10*000104821~CTT01=‘2’ (PO1 line count), CTT02=‘84’ (X12 hash total of PO102 quantities; confirmed quantities live in ACK02). |
Standard PO Confirmation vs. VMI Reverse Purchase Orders
In wholesale nursery operations, the 855 operates in two distinct modes:
- Responding to an Inbound 850 (
BAK01 = '00'): After an inbound850Purchase Order arrives from Lowe’s, Tractor Supply, Walmart, H-E-B, Ace, Do It Best, or Albertsons, your availability team verifies actual salable crop counts in Work Suite FULFILL™. Sending the855within the retailer’s SLA window updates the buyer’s open order before shipping (856, plus optional753routing when required by the partner). - Initiating a VMI “Reverse PO” (
BAK01 = '16'): In Vendor-Managed Inventory (VMI) programs where replenishment planners write orders for the garden center, the process starts with the grower. Your ERP transmits an outbound855proposing store replenishment quantities, and the retailer’s system replies with a binding850Purchase Order with the official PO number needed for the856ASN and810Invoice.
Line-Level ACK Disposition Codes That Protect Your Scorecard
Swapping a plant variety or shorting a tray on the physical rolling rack while leaving the 855 set to ACK*IA (Item Accepted as Ordered) creates an immediate discrepancy when the store scans the rack against your 856 ASN. Instead, every PO1 loop in the 855 should include the ACK01 two-character status code matching your greenhouse commitment:
ACK*IA(Item Accepted): Full ordered quantity (PO102), variety (UP/SK), and requested delivery window (DTM*002) are confirmed without change.ACK*IQ(Item Accepted, Quantity Changed): The variety is accepted, with the confirmed quantity inACK02(for example,24pots instead of36) so the buyer’s system adjusts open on-order expectations before the truck ships.ACK*IC(Item Accepted, Changes Made): Signals an authorized specification or variety substitution so the retailer updates the PO line before receiving.ACK*DR(Item Accepted, Date Rescheduled): Accepts the crop and quantity while proposing a revised ship date (ACK04 = '068',ACK05 = CCYYMMDD) when weather shifts bloom readiness.ACK*IR(Item Rejected): Cancels an unavailable line cleanly at the order stage so it does not hit the dock as an unannounced short.
Related Guides in the Grower EDI Library
- Flagship Interactive Reference: The Ultimate EDI Guide for Growers (All 18 X12 Sets & 12 VMI Data Files)
- Order & Change Cycle: EDI 850 Purchase Order · EDI 855 PO Acknowledgment · EDI 860 PO Change
- Dock, Routing & Rack ASN: EDI 753 & 754 Routing Instructions · EDI 856 Advance Ship Notice & Rack Manifest · EDI 204 Load Tender & 816 Store Directory
- Invoicing, Pay-by-Scan & Settlement: EDI 810 Invoice · EDI 812 Credit/Debit Adjustment · EDI 820 Payment Order & Remittance Advice
- Inventory, POS & Grocery UCS/DEX: EDI 846 Inventory Inquiry/Advice · EDI 852 Product Activity Data (POS) · Grocery UCS 875, 876 & 880 · DSD DEX 894 & 895 · 997, 824 & 864 Control Gates
Silver Fern's EDI team manages live retail EDI for growers today. Open the guide, see how Work Suite fits, or book a demo.