Technology

What Is an EDI 855 Purchase Order Acknowledgement?

What Is an EDI 855 Purchase Order Acknowledgement?

When a retail buyer sends an 850 Purchase Order for live plants, weather swings or grading changes in the greenhouse can shift what is ready to ship. The ANSI X12 855 Purchase Order Acknowledgment (GS*PR) is your formal electronic reply confirming line-by-line quantities, ship dates, and authorized crop substitutions before the truck rolls.

Interactive Dual-Lens Reference: This article is a spoke of The Ultimate EDI Guide for Growers. Step through the segment breakdown in the dedicated EDI 855 sub-guide.

Quick Scorecard: EDI 855 at a Glance

01 · What It IsOutbound PO Confirmation (GS*PR)

The grower’s line-by-line digital response to an inbound 850 Purchase Order (or a Reverse PO in VMI replenishment), confirming which crops will ship as ordered, which require a quantity or ship-date adjustment, and which are rejected or substituted.

02 · Who Uses ItBig-Box, Grocery & Co-op Retail Programs

Partners include Lowe’s, Tractor Supply, Walmart, H-E-B, Ace, Do It Best, and Albertsons.

03 · Why Growers CareProtects Your Fill-Rate Scorecard

Living crops do not always finish on the exact day a buyer forecast months ago. Communicating a crop short or date shift on the 855 within the SLA window avoids unannounced dock shorts and OTIF penalties.

04 · Common IssuesSending ACK*IA When a Bench Is Short

Shorting a tray or swapping a plant variety on the physical rack without transmitting ACK*IQ or ACK*IC causes retail store receiving and the 810 invoice match to fail.

Side-by-Side: Plain-English Operations vs. ANSI X12 Technical Spec

In Plain English · Grower Operations

Your window to confirm quantities, propose VMI Reverse POs, or shift ship dates before shipping.

Because nursery inventory is alive and weather-dependent, a heat wave or a late frost can shift crop readiness by a week. When an 850 Purchase Order arrives in your ERP, your availability team checks actual greenhouse inventory on hand before promising the truck. The 855 Purchase Order Acknowledgment tells the retailer’s buying system what you will put on the racks.

Instead of emailing a buyer and hoping their system updates before the truck arrives, the 855 updates the order at the line level: accepting a line in full, accepting with a reduced quantity, proposing a revised ship date, or flagging an authorized variety substitution. In Vendor-Managed Inventory (VMI) programs, growers can also send an outbound 855 as a ‘Reverse PO’ proposing replenishment quantities so the retailer’s system generates the official 850 PO number.

  • SLA Window: Commonly required within 24 to 48 hours of receiving the inbound 850 Purchase Order.
  • Header Disposition: Declares whether the PO is accepted in full (AD), accepted with changes (AC), or rejected (RD).
  • Line-Level Precision: Every PO1 line includes its own ACK status code (Accepted, Changed Qty, Date Rescheduled, or Rejected).
  • Reverse PO Orders: In VMI programs, an outbound 855 (BAK01='16') proposes replenishment orders before the 850 is issued.
In Technical Terms · ANSI X12 Specification

X12 855 (GS*PR) BAK header disposition and line-level PO1/ACK status qualifiers.

An outbound 855 begins with the BAK segment (Beginning Segment for Purchase Order Acknowledgment). BAK01=‘00’ indicates an original acknowledgment (or ‘16’ Proposed / Reverse PO in VMI replenishment), while BAK02 sets the document-level status: ‘AD’ (Acknowledge With Detail, No Change), ‘AC’ (Acknowledge With Detail and Change, commonly used whenever any ACK01 is not ‘IA’), or ‘RD’ (Reject with Detail). BAK03 echoes the buyer PO number from BEG03, and BAK04 holds the original PO date.

Within each PO1 line loop, the ACK (Line Item Acknowledgment) segment controls line-level reconciliation. ACK01 holds the two-character disposition code: ‘IA’ (Item Accepted), ‘IC’ (Item Accepted: Changes Made), ‘IQ’ (Item Accepted: Quantity Changed), ‘DR’ (Item Accepted: Date Rescheduled), or ‘IR’ (Item Rejected). When ACK01 is ‘IQ’ or ‘IC’, ACK02/ACK03 transmit the confirmed quantity and UOM, while CTT02 hashes the PO102 ordered quantities across all PO1 loops.

  • Functional Group: GS01 = ‘PR’ (Purchase Order Acknowledgment), X12 versions 004010 and 005010.
  • BAK Header: BAK01=‘00’ (Original) | ‘16’ (Reverse PO), BAK02=‘AD’ (No Change) | ‘AC’ (With Change) | ‘RD’ (Reject).
  • Line ACK Codes: ACK*IA (Accepted), ACK*IQ (Qty Changed), ACK*DR (Date Rescheduled), ACK*IC (Sub/Change), ACK*IR (Rejected).
  • ERP Integration: Generated from the committed order allocation in Work Suite FULFILL™.

Verified De-Identified X12 855 Specimen

Below is a complete, de-identified ANSI X12 855 specimen modeled on wholesale nursery traffic. All purchase order numbers (08096470), store numbers (#1242), and UPCs (043210987655, 043210987716) are synthetic reference values:

ST*855*000104821~
BAK*00*AC*08096470*20260414*****20260414~
DTM*068*20260415~
N1*ST*GARDEN CENTER #1242*92*1242~
PO1*10*48*EA*5.25**VP*1G-HYD-END*SK*1000448219*UP*043210987655~
ACK*IA*48*EA*068*20260415~
PO1*20*36*EA*6.50**VP*1G-LAV-HID*SK*1000448302*UP*043210987716~
ACK*IQ*24*EA*068*20260415~
CTT*2*84~
SE*10*000104821~

Segment-by-Segment Dual-Lens Breakdown

SegmentIn Plain English (Grower Meaning)In Technical Terms (X12 Elements & Validation)
ST*855ST*855: Purchase Order Acknowledgment Envelope
Opens the PO Acknowledgment response back to the retail buyer.
ST*855*000104821~
ST01=‘855’, ST02=‘000104821’ inside functional group GS*PR.
BAKBAK*00*AC: Acknowledge With Detail & Change
Signals right at the header: ‘We accept PO #08096470, with at least one line-level quantity or date update.‘
BAK*00*AC*08096470*20260414*****20260414~
BAK01=‘00’ (Original), BAK02=‘AC’ (Acknowledge With Detail and Change; commonly AC when any ACK01 is not IA), BAK03=‘08096470’, BAK04=‘20260414’ (PO Date), BAK09=‘20260414’ (Ack Date).
DTM*068DTM*068: Confirmed Greenhouse Ship Date
Confirms the scheduled ship date (April 15, 2026) when rolling racks leave the nursery dock.
DTM*068*20260415~
DTM01=‘068’ (Current Schedule Ship), DTM02=‘20260415’.
N1*STN1*ST: Confirmed Ship-To Store Location (#1242)
Echoes the destination store (Garden Center #1242) so multi-store PO batches remain tied to the right store.
N1*ST*GARDEN CENTER #1242*92*1242~
N101=‘ST’, N103=‘92’, N104=‘1242’. Matches the inbound 850 N1*ST store identifier.
PO1 & ACK*IA (Line 10)Line 10 Confirmed as Ordered (48 Pots)
Line 10 (1-Gallon Endless Summer Hydrangea) is ready to ship all 48 pots at $5.25 on April 15.
PO1*10*48*EA*5.25**VP*1G-HYD-END*SK*1000448219*UP*043210987655~ + ACK*IA*48*EA*068*20260415~
ACK01=‘IA’ (Item Accepted), ACK02=‘48’, ACK03=‘EA’, ACK04=‘068’, ACK05=‘20260415’.
PO1 & ACK*IQ (Line 20)Line 20 Accepted With Crop Short (24 of 36 Pots)
Only 24 of the 36 ordered Hidcote Lavender pots passed grading; ACK*IQ*24 commits to 24 so the store expects 24 before the truck ships.
PO1*20*36*EA*6.50**VP*1G-LAV-HID*SK*1000448302*UP*043210987716~ + ACK*IQ*24*EA*068*20260415~
ACK01=‘IQ’ (Item Accepted: Quantity Changed) updates the expected receipt from 36 to 24 (72 confirmed units total across the 2 lines).
CTT & SECTT & SE: Line Count (2 Lines) & PO1 Hash Total (84)
Summarizes the 2 PO1 loops and hashes the PO102 quantities (48 + 36 = 84).
CTT*2*84~ + SE*10*000104821~
CTT01=‘2’ (PO1 line count), CTT02=‘84’ (X12 hash total of PO102 quantities; confirmed quantities live in ACK02).

Standard PO Confirmation vs. VMI Reverse Purchase Orders

In wholesale nursery operations, the 855 operates in two distinct modes:

  1. Responding to an Inbound 850 (BAK01 = '00'): After an inbound 850 Purchase Order arrives from Lowe’s, Tractor Supply, Walmart, H-E-B, Ace, Do It Best, or Albertsons, your availability team verifies actual salable crop counts in Work Suite FULFILL™. Sending the 855 within the retailer’s SLA window updates the buyer’s open order before shipping (856, plus optional 753 routing when required by the partner).
  2. Initiating a VMI “Reverse PO” (BAK01 = '16'): In Vendor-Managed Inventory (VMI) programs where replenishment planners write orders for the garden center, the process starts with the grower. Your ERP transmits an outbound 855 proposing store replenishment quantities, and the retailer’s system replies with a binding 850 Purchase Order with the official PO number needed for the 856 ASN and 810 Invoice.

Line-Level ACK Disposition Codes That Protect Your Scorecard

Swapping a plant variety or shorting a tray on the physical rolling rack while leaving the 855 set to ACK*IA (Item Accepted as Ordered) creates an immediate discrepancy when the store scans the rack against your 856 ASN. Instead, every PO1 loop in the 855 should include the ACK01 two-character status code matching your greenhouse commitment:

  • ACK*IA (Item Accepted): Full ordered quantity (PO102), variety (UP/SK), and requested delivery window (DTM*002) are confirmed without change.
  • ACK*IQ (Item Accepted, Quantity Changed): The variety is accepted, with the confirmed quantity in ACK02 (for example, 24 pots instead of 36) so the buyer’s system adjusts open on-order expectations before the truck ships.
  • ACK*IC (Item Accepted, Changes Made): Signals an authorized specification or variety substitution so the retailer updates the PO line before receiving.
  • ACK*DR (Item Accepted, Date Rescheduled): Accepts the crop and quantity while proposing a revised ship date (ACK04 = '068', ACK05 = CCYYMMDD) when weather shifts bloom readiness.
  • ACK*IR (Item Rejected): Cancels an unavailable line cleanly at the order stage so it does not hit the dock as an unannounced short.

Silver Fern's EDI team manages live retail EDI for growers today. Open the guide, see how Work Suite fits, or book a demo.