What Is a 753 EDI Document? (Lowe's Required Ready-to-Ship)
When a wholesale nursery ships collect freight to Lowe’s or another collect-freight retail distribution program, the grower does not book the motor carrier directly. Instead, when required by the retailer’s routing guide, the nursery transmits an ANSI X12 753 Request for Routing Instructions (GS*RF) to the retailer’s Transportation Management System (TMS) declaring the rolling rack count, weight, and cubic volume of ready-to-ship orders, and then receives the retailer’s EDI 754 Routing Instructions (GS*RG) reply. (Note: Silver Fern does not exchange the optional 753 or 754 today; both can be set up when a retail partner requires them.)
Quick Scorecard: EDI 753 at a Glance
A logistics transmission sent by the grower to a retailer’s Transportation Management System (TMS) declaring rack count, cubic feet, gross weight, and ready-to-ship date for one or more purchase orders.
Used in collect-freight retail programs (such as Lowe’s collect routing) where the retailer’s fleet or contracted 3PL arranges pickup. Not exchanged at Silver Fern today; can be set up when a partner requires it.
Missing the retailer’s routing cutoff (check your current vendor routing guide for the exact cutoff window) or understating rack cube on the 753 can delay pickup or bring a trailer that is too small.
Retail TMS engines route by handling-unit count (RA for racks), weight in pounds, and cubic feet, not loose pot counts. Rolling up shelved pots into physical rolling racks is essential before submitting the 753.
Side-by-Side: Plain-English Operations vs. ANSI X12 Technical Spec
Telling the retailer’s traffic department: ‘Your racks are staged; assign the truck.‘
When a retailer manages collect freight, you do not book the carrier yourself. Instead, you notify the retailer’s Transportation Management System (TMS) ahead of its routing cutoff with how much dock space and trailer capacity your shipment requires. That request is the EDI 753 Request for Routing Instructions.
In horticulture, the key step on a 753 is converting individual pots and trays into physical rolling racks, gross watered weight, and cubic feet. After you submit the 753 before cutoff, the retailer’s TMS consolidates stops, assigns a motor carrier SCAC, and replies with an EDI 754 Routing Instructions (GS*RG) message naming the carrier, load ID, and pickup appointment.
- Cutoff Timing: Must be transmitted before the cutoff stated in your retailer’s current routing guide.
- Rack Consolidation: Converts item-level pot quantities into rolling rack counts (
RA), weight (lbs), and volume (cu ft). - Multi-PO Grouping: Groups multiple store POs shipping from the same nursery dock into a single routing request.
- Paired Response: Triggers the inbound 754 Routing Instructions (
GS*RG) containing the assigned carrier SCAC (BLR) and load ID (L11*LO).
X12 753 (GS*RF) BGN header, PER*IC contact, N1*SF origin dock, and LX/N1*ST/USI/OID rollup.
An outbound 753 uses functional group ID ‘RF’ and opens with BGN (BGN01=‘00’ Original, BGN02=Routing Request ID, BGN03=CCYYMMDD date, BGN04=HHMM time, BGN05=‘ET’). Header PER*IC provides the shipping dispatch contact name and telephone number, and N1*SF identifies the Ship-From nursery dock (N103=‘92’, N104=Facility ID).
Inside each LX detail loop, N1*ST identifies the destination store or distribution center, G62*10 states the earliest ready-for-pickup date and time, USI declares handling unit count and packaging code (USI02=‘RA’ for rack), and OID lists the order-level footprint: OID01 (Shipper ID), OID02 (Buyer PO number from 850 BEG03), OID04=‘RA’ (Rack), OID05 (Rack count), OID06=‘L’ and OID07 (Gross weight in pounds), and OID08=‘E’ and OID09 (Volume in cubic feet).
- Functional Group: GS01 = ‘RF’ (Request for Routing Instructions), paired with inbound 754 GS01 = ‘RG’ (Routing Instructions).
- Origin & Contact: PER*IC (Dispatch Contact & Phone) + N1*SF (Nursery Dock ID) + G62*10 (Ready Pickup Date/Time).
- Rack & Cube Detail: USI*2*RA*N + OID segment: OID02 (Buyer PO #), OID04=‘RA’, OID05 (Racks), OID06/07 (Lbs), OID08/09 (Cu Ft).
- Downstream Tie-In: Carrier SCAC and Load ID from the 754 reply copy forward onto the outbound 856 ASN (
TD5/REF*LO).
Verified De-Identified X12 753 Specimen
Below is a complete, de-identified ANSI X12 753 specimen modeled on wholesale nursery collect-freight routing. All trading partner IDs (0722717110100, SAMPLEGROWER), purchase order numbers (08096470), store numbers (#1242), and facility IDs (SFN02) are synthetic reference values:
ST*753*000031904~
BGN*00*RTG20260414-09*20260414*1030*ET~
PER*IC*DOCK DISPATCH*TE*5555550142~
N1*SF*SAMPLE GROWER NURSERY DOCK 2*92*SFN02~
LX*1~
N1*ST*GARDEN CENTER #1242*92*1242~
G62*10*20260416*I*0700*ET~
USI*2*RA*N~
OID*SHP-88412*08096470**RA*2*L*500*E*100~
SE*10*000031904~
Segment-by-Segment Dual-Lens Breakdown
| Segment | In Plain English (Grower Meaning) | In Technical Terms (X12 Elements & Validation) |
|---|---|---|
ST*753 | ST*753: Request for Routing Instructions Opens the Ready-to-Ship routing request to the retailer’s transportation department. | ST*753*000031904~ST01=‘753’, ST02=‘000031904’ inside functional group GS*RF. |
BGN | BGN: Routing Request ID & Timestamp Assigns tracking number RTG20260414-09 and stamps the request at 10:30 AM Eastern on April 14, 2026. | BGN*00*RTG20260414-09*20260414*1030*ET~BGN01=‘00’ (Original), BGN02=‘RTG20260414-09’ (Unique Request ID echoed in 754 BGN06), BGN03=‘20260414’, BGN04=‘1030’, BGN05=‘ET’. |
PER*IC & N1*SF | PER*IC & N1*SF: Origin Nursery Dock & Dispatch Contact Tells the carrier which shipping dock (Dock 2) to back into and provides the dispatch phone number. | PER*IC*DOCK DISPATCH*TE*5555550142~ + N1*SF*SAMPLE GROWER NURSERY DOCK 2*92*SFN02~PER01=‘IC’ (Information Contact), N101=‘SF’ (Ship-From), N103=‘92’, N104=‘SFN02’. |
LX & N1*ST | LX*1 & N1*ST: Destination Store Stop (#1242) Opens stop detail #1 and identifies Garden Center #1242 as the destination for this PO group. | LX*1~ + N1*ST*GARDEN CENTER #1242*92*1242~LX01=‘1’ (Assigned Number), N101=‘ST’, N103=‘92’, N104=‘1242’. Multiple LX loops let the TMS consolidate a multi-stop route. |
G62*10 | G62*10: Racks Staged & Ready Date/Time Confirms the racks will be watered, tagged, and staged on the dock by 7:00 AM Eastern on April 16. | G62*10*20260416*I*0700*ET~G6201=‘10’ (Requested Pickup Date), G6202=‘20260416’, G6203=‘I’ (Earliest Pickup Time), G6204=‘0700’, G6205=‘ET’. |
USI | USI: 2 Rolling Racks Declares 2 rolling nursery racks ( RA) for this stop. | USI*2*RA*N~USI01=‘2’ (Handling Unit Count), USI02=‘RA’ (2-character Packaging Code for Rack), USI03=‘N’. |
OID | OID: PO #08096470 · 2 Racks, 500 lbs, 100 Cu Ft States the physical footprint for PO #08096470: 2 rolling racks weighing 500 lbs gross and occupying 100 cubic feet of trailer volume. | OID*SHP-88412*08096470**RA*2*L*500*E*100~OID01=‘SHP-88412’ (Shipper ID), OID02=‘08096470’ (Buyer PO Number), OID04=‘RA’ (Rack), OID05=‘2’, OID06=‘L’ (Pounds), OID07=‘500’, OID08=‘E’ (Cubic Feet), OID09=‘100’. |
SE | SE: Transaction Set Trailer Closes the 10-segment routing request and awaits the retailer’s 997 receipt and 754 carrier assignment. | SE*10*000031904~SE01=‘10’ (Total segments from ST to SE), SE02=‘000031904’. |
The Paired Lifecycle: How the 753 Request Triggers the 754 Carrier Assignment
When a collect-freight program requires EDI routing, the 753 and 754 travel as a round-trip logistics handshake between the shipping office and the retailer’s traffic department:
- Step 1: Transmit the
753Request for Routing Instructions (GS*RF): After confirming the order on an855Acknowledgment and calculating rack counts, transmit the753before the cutoff time specified in your retailer’s routing guide. - Step 2: The Retailer’s TMS Consolidates Multi-Stop Routes: The retailer’s TMS groups your nursery’s rolling racks (
USIandOIDweight/cube) with other nearby stops to fill a trailer. - Step 3: Receive the
754Routing Instructions (GS*RG): The retailer replies with an inbound754(see the EDI 754 sub-guide) containing the assigned 4-letter motor carrier SCAC code (BLR*DNTR), the master TMS Load ID (L11*LD7749201*LO), and the pickup appointment (G62*69). - Step 4: Load in Stop Sequence and Transmit the
856ASN: The dock team stages rolling racks in reverse stop sequence so the last store drop goes into the nose of the trailer first, and the confirmed shipment in Work Suite FULFILL™ generates the outbound EDI 856 Advance Ship Notice with the carrier SCAC and Load ID.
Why the 753 Uses Rack Counts and Cubic Feet
A common mistake in collect-freight onboarding is sending raw pot or flat counts on the 753 instead of consolidated rolling rack footprints. Transportation Management Systems allocate trailer deck space by rack count (RA), gross weight in pounds (OID06 = 'L'), and volume in cubic feet (OID08 = 'E'). Rolling up mixed shelves of annual flats, 1-gallon pots, and hanging baskets into physical rack counts before sending the 753 prevents trailer-capacity mismatches on pickup day.
Related Guides in the Grower EDI Library
- Flagship Interactive Reference: The Ultimate EDI Guide for Growers (All 18 X12 Sets & 12 VMI Data Files)
- Order & Change Cycle: EDI 850 Purchase Order · EDI 855 PO Acknowledgment · EDI 860 PO Change
- Dock, Routing & Rack ASN: EDI 753 & 754 Routing Instructions · EDI 856 Advance Ship Notice & Rack Manifest · EDI 204 Load Tender & 816 Store Directory
- Invoicing, Pay-by-Scan & Settlement: EDI 810 Invoice · EDI 812 Credit/Debit Adjustment · EDI 820 Payment Order & Remittance Advice
- Inventory, POS & Grocery UCS/DEX: EDI 846 Inventory Inquiry/Advice · EDI 852 Product Activity Data (POS) · Grocery UCS 875, 876 & 880 · DSD DEX 894 & 895 · 997, 824 & 864 Control Gates
Silver Fern's EDI team manages live retail EDI for growers today. Open the guide, see how Work Suite fits, or book a demo.