Plain English Grower Operations
Line ConfirmationAccepts, adjusts quantity, or substitutes each ordered plant line.
VMI Reverse POOriginates grower-proposed replenishment orders in VMI programs (BAK02='AP').
Expected receiptUpdates the retailer's expected receipt before 753 routing.
Short-ship deductionsOver-promising on the 855 shows up as a short ship on the 856, and the chargeback comes back on an 812 or as an 820 deduction.
Common IssueSwapping a 1-gallon purple petunia for a 1-gallon pink petunia on the physical rack without sending ACK*IS (Item Accepted: Substitution Made) on the 855 causes a SKU mismatch at receiving and a chargeback.
ANSI X12 / UCS Technical Specification
Envelope & HeaderGS01='PR'; BAK01='00', BAK02='AC' (With Change), 'AD' (No Change), or 'AP' (Product Replenishment, used for a VMI reverse PO).
Line DispositionACK*IA (Accepted), ACK*IQ (Qty Changed), ACK*IS (Item Substituted).
Rejection CodeACK*IR (Line Rejected) when a crop fails grading after frost.
Item & TotalsPO1 echoes original line #; CTT01 verifies total line count.
Control & ValidationThe sample closes with CTT: the line count and the total units ordered.